Skip to product information
1 of 8
✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY✨ THIS OFFER IS FOR LIMITED TIME ONLY

Smart GPS Wireless Dog Fence Collar | Tailbourne

Smart GPS Wireless Dog Fence Collar | Tailbourne

Regular price £129.99 GBP
Regular price £179.99 GBP Sale price £129.99 GBP
- 27% Sold out
Taxes included. Shipping calculated at checkout.

Hurry up! Only 7 items are in stock.

✓ Secure checkout

✓ Fast UK shipping

Color: BLACK
Order within
for shipping tomorrow
Estimated delivery: 3–7 days
24/7 support
Free return

Keep Your Dog Safe Without Building a Fence

The Tailbourne Smart GPS Wireless Dog Fence Collar creates a secure virtual boundary for your dog using advanced GPS technology. If your dog approaches the edge of the safe zone, the collar gently alerts them and guides them back inside.

Give your dog the freedom to explore while maintaining control and safety without installing physical fencing.

Key Features

  • High-precision GPS positioning for accurate outdoor boundary control
  • Wireless containment system — no buried wires or complex installation
  • Adjustable training modes including sound, vibration and correction levels
  • TFT display screen with clear real-time distance monitoring
  • Fast signal transmission for responsive boundary alerts
  • IP67 waterproof construction for outdoor reliability
  • Rechargeable battery with magnetic charging

Why You’ll Love It

This smart pet product helps protect your dog while giving them the freedom to move around outdoor spaces safely. Ideal for gardens, open fields or countryside homes, it creates a virtual boundary that supports consistent training and peace of mind.

The modern design and durable construction make it a dependable addition to your dog accessories collection.

Smart Technology Benefits

Advanced GPS positioning technology establishes a virtual boundary around your chosen area. If your dog approaches the edge, the collar delivers progressive alerts to guide them back inside the safe zone.

The intuitive display and adjustable settings allow owners to customize the training experience based on their dog’s behavior and sensitivity.

Recommended For

  • Dogs that enjoy outdoor freedom
  • Homes without physical fencing
  • Training dogs to stay within safe boundaries
  • Pet owners looking for smart pet technology

What’s Included

  • Smart GPS dog fence collar
  • Magnetic charging cable
  • Adjustable collar strap
  • User setup guide

Technical Specifications

  • Product Type: Smart GPS wireless dog fence
  • Material: Durable ABS plastic
  • Waterproof Rating: IP67
  • Display: TFT screen
  • Charging Method: Magnetic charging
  • Training Modes: Sound, vibration and correction
  • Use: Outdoor dog containment system

Explore More

Tailbourne Customer Promise

  • ✔ Free UK Shipping
  • ✔ Secure Checkout
  • ✔ 30-Day Satisfaction Guarantee
  • ✔ Trackable Delivery

Frequently Asked Questions

Does this collar require WiFi?
No. The system uses GPS satellite positioning and does not require WiFi.

Is the collar waterproof?
Yes, the collar has an IP67 waterproof rating designed for outdoor use.

How large can the boundary be?
The adjustable virtual fence can cover distances up to approximately 2000 metres.

Is it safe for dogs?
The collar provides progressive alerts such as sound, vibration, or correction to guide your dog back into the safe area.

How long does the battery last?
Battery life varies depending on usage but typically lasts several days per charge.

Our Guarantee

  • Quality checked before shipping
  • Secure checkout
  • Friendly customer support
View full details
Selected Variant Image
Smart GPS Wireless Dog Fence Collar...
BLACK
Regular price £129.99 GBP
Regular price £179.99 GBP Sale price £129.99 GBP
Selected Variant Image
Smart GPS Wireless Dog Fence Collar | Tailbourne
BLACK
Regular price £129.99 GBP
Regular price £179.99 GBP Sale price £129.99 GBP

Thoughtful Care

We believe every pet deserves comfort that feels natural and reassuring. Our approach starts with simple, well-designed essentials that support everyday wellbeing.

Modern Living

Tailbourne brings together practical solutions and calm, contemporary style. Each item is chosen to make daily routines smoother, safer and more enjoyable for pets and their owners.

Shop all

Comfort First

Why us?

See how our essentials stand out with clear, simple advantages designed to support better everyday care.

  Others

Comfort

Safety

Quality

Durability

Convenience

FAQs

Tailbourne FAQ

1. How long does delivery take?

Orders typically arrive within12 business daysfrom dispatch, with a maximum delivery window ofup to 30 daysduring busy periods or unforeseen delays. All products are shipped directly from our fulfilment partners, and most customers receive their items earlier than the estimated timeframe.

2. Do you ship worldwide?

Yes, Tailbourne offersworldwide shipping. Orders can be delivered to most countries, although some remote locations or restricted regions may not be available. Exact availability, delivery times and charges will be shown at checkout once you enter your shipping address.

3. Will I have to pay customs duties or import taxes?

For orders shipped outside the United Kingdom, your local customs office may applyduties, taxes or handling fees. These charges are set by local authorities and are the responsibility of the customer. We recommend checking your country’s import rules if you are unsure about possible fees.

4. Can I change or cancel my order after placing it?

Because we start processing orders shortly after they are placed, changes or cancellations are not always possible. If you need to amend your order, please email tailbourne.care@gmail.com as soon as possible with your order number. If the order has not yet been processed, we will do our best to help.

5. What is your return policy?

We offer a 14-day return window from the day you receive your order. Items must be unused and in their original condition, where reasonably possible. If you receive a faulty or incorrect item, we will arrange an appropriate solution. Please contact tailbourne@outlook.com before returning anything so we can provide the correct instructions.

what our customers say about us

4.8

Based on 16 Reviews

5.0
3 Reviews
100%
0%
0%
0%
0%

Review this product

Share your thoughts with other customers

  • S
    Sofia R.
    UK flag
    August 2025
    Verified Buyer
    The Temperature Control Is Amazing
    The temperature control is amazing. My senior dog seems much more comfortable and relaxed.
  • J
    Johan D.
    UK flag
    December 2025
    Verified Buyer
    Reliable products and great service.
    Everything arrived on time and matched the descriptions perfectly. The items feel well-made and truly make day-to-day care easier. Customer support was also incredibly helpful
  • M
    Marta S.
    UK flag
    June 2025
    Verified Buyer
    Peace of Mind While I’m Away
    I love being able to monitor feeding time through the HD camera. The app is easy to use, and setting schedules only takes a few minutes. The 5L container holds plenty of food, and portions are dispensed accurately. It’s made daily feeding much easier and gives me peace of mind when I’m away from home.